Skip to main content

South Dakota State Library: Digital Collections

Add or remove other collections to your search:



Narrow your search by:



Publisher

Subject

Description

Title

You've searched: All Collections

  • All fields: Pittman-Robertson
(104 results)



Display: 20

    • The 1950 Antelope Census in South Dakota

    • Antelopes -- South Dakota -- Counting; Antelopes -- South Dakota; Pronghorns -- South Dakota; Pittman-Robertson Project (S.D.)
    • The 1950 antelope census found 10,568 antelope in the counties of Harding, Butte, central Meade and western Fall River. The antelope herds in those counties averaged increases of more than 50 percent since 1949.
    • Locker and Field Checks of Antelope and Analysis of Hunter Report Card Data, 1969

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • This report summarizes the 1969 pronghorn firearm hunter report card data. No special field studies were made. The hunting season is a most important tool for management of the North American Pronghorn. Ultimate objectives of an antelope hunting...
    • Locker and Field Checks of Antelope and Analysis of Hunter Report Card Data, 1970

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • This report summarizes the 1970 pronghorn archery and firearm hunter report card data. No special field studies were made. The hunting season is a most important tool for management of North American pronghorn. Ultimate objectives of an antelope...
    • Antelope Harvest Regulations Study, 1973

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • Data gathered throughout 1973 under Pittman-Robertson Project W-95-R-7 Job No. 2-E and W-95-R-8 for Study VIII, Jobs 1 and 2 are summarized in this report. It is estimated that prior to 1800 over 700,00 pronghorns ranged the prairies of South...
    • Locker and Field Checks of Antelope and Analysis of Hunter Report Card Data, 1966-67

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • This report summarizes the 1966 Pronghorn archery and firearms seasons hunter report card data and hunting season field biological collections. The hunting season is the most important tool for the management of North American Pronghorn. Ultimate...
    • Locker and Field Checks of Antelope and Analysis of Hunter Report Card Data, 1967

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • This report summarizes the 1967 pronghorn archery and firearms seasons hunter report data. The hunting season is the most important tool for the management of North American pronghorn. Ultimate objectives of an antelope-hunting season are to...
    • Antelope Harvest Regulations Study, 1975

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • Presented in this report are data gathered during the 1975-76 fiscal period under Pittman-Robertson Project W-95-R-10 for Study Number titled Antelope Harvest Regulations Study.
    • Antelope Harvest Regulations Study, 1974

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • Presented in this report are data gathered during the 1974-75 fiscal period under Pittman-Robertson project W-95-R-9 for Study Number VIII titled Antelope Harvest Regulations Study.
    • Locker and Field Checks of Antelope - 1958

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • Sex, age and general condition checks were made in the field and at locker plants during the 1958 antelope season. This data gives information concerning the degree of harvest, productivity and hunter selectivity on South Dakota's antelope...
    • Locker and Field Checks of Antelope and Analysis of Hunter Report Card Data, 1968

    • Antelopes -- South Dakota; Antelope hunting -- South Dakota; Pronghorn hunting -- South Dakota; Pronghorns -- South Dakota; Hunting -- South Dakota; Pittman-Robertson Project (S.D.)
    • This report summarizes the 1968 pronghorn archery and firearm hunter report card data. No special field studies were made. The hunting season is a most important tool for management of North American pronghorn. Ultimate objectives of an antelope...
    • Antelope Age Ratio Study by Aerial Transect in 1952

    • Antelopes -- South Dakota; Pronghorns -- Mortality -- South Dakota; Pronghorns -- Age -- South Dakota; Pittman-Robertson Project (S.D.)
    • Between July 2 and September 18 of 1952 six 460 mile transects were flown to check antelope age ratios to find out if the apparent loss of kids took place during the summer months. Since the age ratios remained relatively constant during this...
    • The Spring Inventory of Antelope in South Dakota - 1958

    • Antelopes -- South Dakota; Pronghorns -- South Dakota; Antelopes -- Counting -- South Dakota; Pronghorns -- Counting -- South Dakota; Pittman-Robertson Project (S.D.)
    • An aerial spring antelope census was made in 1958 to ascertain the population and the buck:doe:kid ratio in eleven West-River counties in South Dakota. Data obtained from the census indicated an antelope population of 15,585, an 8% decrease from...
    • Antelope Restoration

    • Antelopes -- South Dakota; Pronghorns -- South Dakota; Pittman-Robertson Project (S.D.)
    • The Antelope Restoration Project has three objectives: 1. To restock those portions of Western South Dakota which historically were populated by antelope but which now have few or no antelope. 2. To restock the Antelope Reserve for...
    • 1952 Antelope Restoration

    • Antelopes -- South Dakota; Pronghorns -- South Dakota; Pittman-Robertson Project (S.D.)
    • This is a job completion report, as require by the Federal Aid in Wildlife Restoration Act. The focus of this report is South Dakota's antelope population.
    • The 1952 Antelope Season in South Dakota

    • Antelopes -- South Dakota; Pronghorns -- South Dakota; Pronghorn hunting -- South Dakota; Pittman-Robertson Project (S.D.);
    • During the 1952 antelope season in South Dakota 7646 antelope of all ages and both sexes were harvested by 8350 permittees for an average success of 91.6 percent. The hunters showed a definite preference for bucks.
    • Inventory of Nesting Raptors in South Dakota

    • Birds of prey -- South Dakota; Wildlife conservation -- South Dakota; Pittman-Robertson Project (S.D.)
    • In the spring of 2011, an aerial survey was conducted in northwest South Dakota for nesting raptors. Species surveyed included: bald eagle (Haliaeetus leucocephalus), ferruginous hawk (Buteo regalis), great horned owl (Bubo virginianus), golden...
    • Bobcat Management Surveys, 1977

    • Bobcat -- Monitoring -- South Dakota; Bobcat -- Habitat -- South Dakota; Bobcat -- Geographical distribution -- South Dakota; Hunting surveys -- South Dakota; Wildlife management -- South Dakota; Pittman-Robertson Project (S.D.)
    • Presented in this report are data gathered primarily during the 1977-78 and 1978-79 periods under Pittman-Robertson Project W-95-R for Study Number XVI, Job 1. Also included are results of a bobcat harvest questionnaire sent out in 1977 to cover...
    • Bobcat Management Surveys, 1983-84

    • Bobcat -- Monitoring -- South Dakota; Bobcat -- Habitat -- South Dakota; Bobcat -- Geographical distribution -- South Dakota; Hunting surveys -- South Dakota; Wildlife management -- South Dakota; Pittman-Robertson Project (S.D.)
    • Presented in this report are data gathered during the 1983-84 period under Pittman-Robertson Project W-95-R for Study Number 9516, Jobs 1, 2 and 3. This is the fifth progress report on this study.
    • Bobcat Management Surveys, 1986-87

    • Bobcat -- Monitoring -- South Dakota; Bobcat -- Habitat -- South Dakota; Bobcat -- Geographical distribution -- South Dakota; Hunting surveys -- South Dakota; Wildlife management -- South Dakota; Pittman-Robertson Project (S.D.)
    • Data gathered during 1986 and 1987 on Bobcat Management Surveys under Pittman-Robertson Project W-95-R-21, Study 9516, Job 1 are analyzed and presented in this annual report. Since the bobcat season was closed in 1984-85 and 1985-86, the previous...
    • Bobcat Management Surveys, 1996-97

    • Bobcat -- Monitoring -- South Dakota; Bobcat -- Habitat -- South Dakota; Bobcat -- Geographical distribution -- South Dakota; Hunting surveys -- South Dakota; Wildlife management -- South Dakota; Pittman-Robertson Project (S.D.)
    • Data gathered during 1996 and 1997 on Bobcat Management Surveys under Pittman-Robertson project W-95-R-30, Study 9516, Job 1 are analyzed and presented in this annual report.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK